As the time is drawing near when this institution must be opened, it may be well to say a few words as to how far the work has been carried toward completion, and how well prepared we are for the reception of the students.
The work when commenced, was supposed to be completed at an expense of somewhere between $75,000 and $100,000. When the interest in the institution became more fully developed, it was evident that the work of construction must be expanded rather than contracted, to meet the growing demands; for these reasons the work has been greater and more expensive than first contemplated.
The College building has been completed, also the ladies’ dormitory. The Scandinavian and German double dormitory is drawing toward completion, but the finishing is not completed on the inside, neither can it be completed in less than sixty days.
Our heating apparatus is well-nigh ready for operation in the former buildings, but in the latter it cannot be completed by Sept. 30.
The total expense which must be incurred to be fully ready to open, will be fully $135,000, and this does not include the boys’ dormitory which is not yet commenced. This work might have been further advanced, had the means been furnished as promptly as expected.
While the work has been kept moving from the first, it might have been completed, had we been certain at all times of financial support. Financially, the enterprise is in the best of condition, as we have only spent money as it has been within sight.
The Board of Managers, after having consulted with others most interested, have decided that it will not be best to open the German and Scandinavian departments until Nov. 25, by which time everything will be completed and in good condition to commence work in these departments in a proper manner. If these departments were opened at the same time as the English, we would not be ready, and probably could not properly care for the students for at least thirty days. Considering all things connected therewith, it is thought best to make this announcement.
The English department will be fully ready at the time already set, Sept. 30, but the foreign departments will not open until Nov. 25.
A. R. HENRY, Pres. Board of Managers.