THE development of the modern railroad is one of the chief wonders of the age. Fifty years ago the idea of a submarine tunnel under one of the broadest rivers upon this continent would have been laughed at by the average citizen. Even the skilled engineer would have pronounced it an impossibility. But it is now an accomplished fact. The St. Clair railroad tunnel, passing under the river of that name, and connecting the cities of Port Huron, Mich., and Sarnia, Ont., has been in use for several months, and is pronounced a perfect success. It was the privilege of the writer to pass through the great tunnel recently, and to examine it at leisure. Previous to the construction of this tunnel, the cars of the Grand Trunk Railway were transferred across the river by means of ferries. This was a slow and clumsy arrangement.
In winter the transit was impeded by ice blocks, while in summer, or during the season of navigation on the Great Lakes, transfer from side to side was often hampered and delayed by reason of the immense volume of shipping passing to and fro on the river. It will be remembered that nearly the entire volume of marine traffic of the Great Lakes passes through the St. Clair River en route between the West and the East. Time is not only money in the railway business, but to save time, to increase speed and comfort, the companies annually spend millions of dollars. The traffic of the Grand Trunk system has so largely increased in recent years that the abandonment of the boat system of car transfer was rendered almost a necessity. First a bridge was talked of. After some serious consideration, that scheme was abandoned. Then the boring of the tunnel was decided upon. The experiment was watched with intense interest.
Work was begun upon it in October, 1886, and after nine months of labor, 186 feet having been accomplished upon the Canadian side, and 20 feet upon the American side, it was abandoned, and a new plan was tried. This plan contemplated starting the full-sized tunnel by means of shafts, but the attempt was unsuccessful. What is known as the “open-cut portal” was finally adopted, and the work pushed with great patience and earnestness to a successful conclusion. The tunnel proper is a continuous iron tube 19 feet and 10 inches in diameter, and 6,025 feet in length, or a trifle over a mile. The open portals, or approaches, in addition to the tunnel proper, are 5,603 feet in length, making all told a trifle over two miles. It requires about four or five minutes to pass through. During the passage no object can be seen outside the car window. Everything is dark. The train is drawn by an immense locomotive, built expressly for this duty. The engineer and fireman find their work disagreeable and dangerous. If it were not for the fact that an engine is used to pump fresh air into the tunnel, men could not be secured who would run the fearful risks.
The admitted success of the Grand Trunk tunnel has interested railroad engineers all over the world. It is stated that a second tunnel will be bored at Port Huron, and that one will certainly be constructed under the Detroit River at Detroit, Mich. The great tunnel under the Niagara River near Buffalo is already in course of construction.—G. T. Sexton, in the Epworth Herald.