BEING interested to learn how cement is made, I visited the large cement works near Yankton, S. D. These works are situated on the Missouri River a few miles west of the town, where the crude material, chalk and clay, is found in abundance.

I first visited the engine-room, where an engine of five hundred horse-power was at work. It consumes six and one-half tons of coal in ten hours, and a point on the circumference of the fly-wheel travels nearly five thousand feet a minute. Through a system of belts, shafts, and pulleys, the engine moves the machinery of the plant. Operating at full capacity, the output of cement is twenty tons a day. Seventy-five men and boys are employed. The clay and chalk are first mined, then carried to the second floor in a car drawn by a cable. From there they are weighed, mixed, and fed into a grinder. Being mixed with water, the material is reduced to thick mud. Afterward it is thrown into open vats, where in good weather it hardens in about seven days. Then it is piled in drying-sheds and afterward carried in buckets on an endless cable to large retorts, which are generally about twenty feet wide and fifty feet deep, and are filled with coke and “mud” in alternate layers about five and thirteen inches thick. When these are filled, the opening is closed, and covered with fire-clay. One week is usually sufficient for burning. Then the product is ground fine, and conveyed to a large warehouse, where it is sacked or barreled ready for shipment. When an order for cement is received, it can be loaded on the cars direct from the warehouse. From each carload a sufficient quantity is kept to make three forms, which are of the thickness of one inch vertically, and one inch in the center and about one and one-half inches at the ends laterally. These are for testing the tensile strength of the cement. On the seventh day from the time the forms are made, the first test is taken. The form is placed in clamps, which are closed on each end, and then pulled apart. Weights indicate the power required, which is from two hundred and fifty to six hundred and ten pounds,—usually about four hundred and fifty. Three hundred and fifty pounds is full standard. That kept twenty-eight days requires over eight hundred pounds to break, while that kept for one year is almost like stone. A record of each test is placed on a card, which is kept on file. If a purchaser is not satisfied with his cement, he can trace its record, and so determine its original strength.

Tests are also made to see how soon the cement sets, or hardens. The time varies with different lots, but it is usually from fifty-two minutes to four hours.

JAMES C. ANDERSON.