WORD has been received that work on the great Simplon tunnel, through the Alps, which was to be the largest and finest tunnel in the world, has been completely suspended. This has been necessitated by water pouring into the tunnel from a boiling spring; fifteen thousand gallons a minute flow out of the south end of the tunnel. July 1, 1905 was the date set for the completion of the stupendous task; nearly two thirds of the fourteen-mile tunnel had been excavated by July 1, 1902. Notwithstanding the labor, and millions of dollars that have already been expended, it is said by a Swiss expert that the tunnel will probably never be pierced.
Simplon Tunnel Work Suspended by Flooding Spring
From The Youth’s Instructor, Vol. LII, No. 49, December 6, 1904