College Building Addition Planned for Manual Training
Before this paper reaches its readers, ground will be broken for an addition to the College building in this city, according to the recommendation of the last General Conference. Last week the Board decided upon the style, size, and location of the building. It will be joined to the present building on the south, and consist of two stories, with basement and well-lighted attic. The basement, first floor, and attic will be devoted to the Manual Training department; while the second floor will furnish a chapel, which can also be used for a general study room, 50 by 70 feet, capable of seating 500 students. By this means the present chapel can be divided into recitation rooms. These improvements are greatly needed even with the present attendance. They will make the work of the teachers much easier and all departments more efficient. It is designed to have the building ready for use by the beginning of the next College year, about the first of September next.